Anping Yachao Hardware Wire Mesh CO.,LTD.
|
Price: | 1.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
hot-dipped galvanized gabion box
Material:high quality low carbon steel wire, stainless steel wire , PVC coated wire , Iron wire ,etc
Weaving patters:Straight twist, reverse twist, double twist.
Suface treatmeat
Electro galv. hexagonal wire netting :galv. after weaving
Electro galv. hexagonal wire netting : galv. before weaving
Hot dipped galv. hexagonal wire netting : galv. after weaving
Hot dipped galv. hexagonal wire netting : galv. before weaving
Stainless steel hexagonal wire netting
Application:
A. Control and guide of water or flood
B. Preventing of rock breaking
C. Water and soil protection
D. Protection engineering of seaside area
Model | Hole (mm) | Mesh wire(mm) | Side wire(mm) | Binding wire(mm) | Max width |
DL60 | 60X80 | 2.0~2.8 | 3.0~4.0 | 2.0~2.2 | 4M |
DL180 | 80X100 | 2.0~3.0 | 3.0~4.0 | 2.0~2.2 | 4M |
DL80W | 80X120 | 2.0~3.0 | 3.0~4.0 | 2.0~2.2 | 4M |
DL100W | 100X120 | 2.0~3.0 | 3.0~4.0 | 2.0~2.2 | 4M |
DL100W | 100X150 | 2.0~3.0 | 3.0~4.0 | 2.0~2.2 | 4M |
DL120 | 120X150 | 2.0~3.0 | 3.0~4.0 | 2.0~2.2 | 4M |
Length (m) | Width (m) | Height (m) | Spacer number | Volume (m2) | Tolerance range |
2.0 | 1.0 | 0.15---0.3 | 1 | 0.3~0.6 |
Length :±/-3% Width :±/-5% Height :±/-5% |
3.0 | 1.0 | 0.15---0.3 | 2 | 0.45~0.9 | |
4.0 | 1.0 | 0.15---0.3 | 3 | 0.6~1.2 | |
2.0 | 1.0 | 0.5 | 1 | 1.0 | |
3.0 | 1.0 | 0.5 | 2 | 1.5 | |
4.0 | 1.0 | 0.5 | 3 | 2.0 | |
1.0 | 1.0 | 1.0 | 0 | 1.0 | |
1.5 | 1.0 | 1.0 | 0 | 1.5 | |
2.0 | 1.0 | 1.0 | 1 | 2.0 | |
3.0 | 1.0 | 1.0 | 2 | 3.0 | |
4.0 | 1.0 | 1.0 | 3 | 4.0 |
How to install welded gabion mesh?
Step 1. Ends, diaphragms, front and back panels are placed upright on the bottom section of wire mesh.
Step 2. Secure panels by screwing spiral binders through the mesh openings in adjacent panels.
Step 3. Stiffeners shall be placed across the corners, at 300mm from the corner. Providing a diagonal bracing, and crimped over the line and cross wires on the front and side faces. None are needed in interior cells.
Step 4. Gabion box is filled with graded stone by hand or with a shovel.
Step 5. After filling, close the lid and secure with spiral binders at the diaphragms, ends, front and back.
Step 6. When stacking tiers of the welded gabion mesh, the lid of the lower tier may serve as the base of the upper tier. Secure with spiral binders and add pre-formed stiffeners to exterior cells before filling with graded stones.